Team | Architect: Calvert Wright Architecture Contractor: RJ Green Construction Corp. Agency: DASNY Superstructures |
---|---|
Project Manager | Naomi Davies |
Location | Baker Theatre Building |
Project Description
In keeping with the third-floor walkways that connect other academic buildings on campus, the new Baker Link will bridge the gap between Hunter’s Baker Theatre Building and the East Building, creating an academic “street” hovering above the city below. The proposed walkway will be framed in steel and clad in a rain-screen system of fiber-cement and corrugated metal panels.