This project will create new signage for Cooperman Library.
These funds supplement the $1.15M Reso A award.
This project will create a stand-alone HVAC unit to exclusively service the West Bulding Art Gallery.
This project will create a single stop center for student services to include admissions, advisement, financial aid, and pre-matriculation programs.
This project will upgrade furniture, finishes, technology, and lighting in several classrooms.
This request will renovate the flooring of the park to prevent water to continue to filtrate into the lower levels of the library.
This request will replace the Roosevelt House roofs that have been leaking.
This request will upgrade most exterior doors as well as access control systems.
This request will start the design for the expansion of research labs in the North Building.
This request will expand student seating and study spaces on the 68th Street Campus.
This request will upgrade the internet fiber cable connection Roosevelt House to the CUNY ring.
This project will commence the design of the replacement of all escalators in the West and East Buildings.
This request will allow the chillers to work year-round.
This request will complete the replacement of emergency exit signage on the West, East, and Thomas Hunter Hall.
This request will utilize a JOCs contract to make repairs that will sustain operation of current elevators.
Pre-design underway to develop viable Decarbonization Projects based on the initial study.
Initial allocation for design of renovations to the West-North Tunnel to address water filtration issues.
Initial allocation for design of renovations to the North Building's pool and related facilities.
This project will install LED lighing around 68th Street Campus.
This project will study the condition of and make recommendations for the three Iconic Hunter bridges.
Window replacement will enable Hunter to cut demand by as much as 50% thereby lowering our energy consumption.
This project will replace the existing end-of-life Building Management Systems (BMS) that control our HVAC supply and demand.
Current funding is for design only. Includes a study and recommendations for heating, cooling, and ventilation (HVAC) Systems.
This project will procure and install smart boards in a number of classrooms.
Replacement of phone system.
This project aims to make the 68th Street campus more attractive and inviting.
This project will increase student study spaces.
This project will fund the temporary relocation of the Speech Language Pathology department to the Graduate Center.
Funding of this project includes temporary relocation of the Nursing School to a leased facility built at SPARC.
This project will renovate the Blackbox Theater, Film and Media's computer lab and adjacent lecture hall.
This project will renovate the Silberman Building.
This project will initially fund the next cycle of façade inspections.
This project is for the design and replacement of the North Building freight elevators.
This project is for the design and replacement of all East Building elevators.
This project is for the design and replacement of all West Building elevators.
IT project upgrades
A transformation of Hunter’s largest assembly space into a state-of-the-art performance venue.
This project will renovate 8 bathrooms on floors 3, 7, and 9 of the North Building to be used by all genders.
This project will create two additional classrooms in the third floor of the North Building.
This project will complete the third and last phase of the roof renovations in the North Building.
This project will renovate the lower roofs of the West Building.
This project will upgrade the emergency public address sytem.
This project will upgrade the infrastructure of Thomas Hunter Hall with electric based HVAC systems.
Transforming the Hunter College Brookdale campus. A Joint venture between Hunter, CUNY, New York State, and New York City EDC.
Repairs to the 8th floor terrace will provide quality outdoor space to the Hunter College community.
This project relocated Hunter's Duplicaiton and Mailroom to makeway for the additional classrooms in North Building.
This project will create two meditation rooms in the B-1 level of the West Building.
This project is 90% complete and will upgrade the lighting fixtures to LED.
Various small replacement projects underway managed by Hunter Engineering.
This project will renovate the elementary school playground at the Hunter College Campus School campus.
This project will upgrade the fire alarm panels and transponders in the 68th Street Campus.
This project partially replaces HVAC components throughout the 68th Street campus.
This project replaces corroded condensate lines in the North Building.
This project will provide renovations to the North, West and East Buildings in order to temporarily relocate multiple programs and labs.
This project will renovate the 2nd floor of the library for a variety of student facing purposes including a new career services office.
Upgrades to the emergency generator system will ensure that services continue in the event of a power outage on campus.
Replacing the old roof with new heat-deflecting materials and waterproofing will make this terrace more accessible and energy efficient.
Upgrades to the acid neutralization tanks in the North Building will help safeguard the environment and laboratory drainage systems.
This popular theater venue and centerpiece for performing arts at Hunter College will receive a new HVAC and dehumidification system.
Modernizing lecture halls in the North and West Buildings will result in better acoustics, new seating configurations and other important upgrades.